SCROLL DOWN

Location

Nationwide, Greece

Project

Implementation of 23 net-metering systems across LIDL stores throughout Greece, with a total installed capacity of 3.8 MW.

Implementation

The installation was carried out using high-tech photovoltaic equipment, carefully selected from leading manufacturers in the market. The systems were chosen based on the specific energy and technical requirements of each project, ensuring reliability, efficiency, and maximum lifespan of the installation.

LIDL Store Network – 23 Net-Metering Projects Nationwide

This project exemplifies the strategic use of green energy in retail, confirming the company’s commitment to sustainability.

With 23 net-metering photovoltaic projects in Greece, the company leverages solar technologies and leads in corporate sustainability.

Installing photovoltaic systems helps:

  • Strengthen store network sustainability
  • Cut energy use and the environmental footprint
  • Save on operational costs
  • Boost energy independence and efficiency

This initiative proves green energy drives business growth, balancing economic efficiency with environmental responsibility.