SCROLL DOWN

Location

Paramythia, Thesprotia

Project

Greece’s first electric vehicle charging hub, pioneering the installation of Huawei’s 600 kW liquid-cooled charger, sets a new national benchmark for e-mobility infrastructure.

Implementation

Implementation: The installation was implemented using state-of-the-art technology:

  • Chargers: HUAWEI 600 kW Ultra-Fast Charging (Liquid-Cooled)
  • Carports: ALUMIL
  • Photovoltaic panels: Jinko 590 W
  • Battery storage system: HUAWEI Luna 2000 – 215 kWh HUAWEI

First Electric Vehicle Charging Hub in Greece with a 600 kW Liquid-Cooled Charger

The project marks a milestone in green mobility, as it is the first electric vehicle charging hub in Greece equipped with a 600 kW liquid-cooled charger. This installation signifies the transition to a new era of fast and sustainable e-mobility, integrating cutting-edge technologies.

The solution is based on the FusionCharge Liquid-Cooled Power Unit. With its scalable design, the Power Unit’s maximum capacity can reach 720 kW, making it the most powerful and fastest charger of its category in the country.

The project includes:

  • Carport with photovoltaic panels for clean energy generation
  • Energy storage station for enhanced energy autonomy
  • Energy Management System (EMS) ensuring optimal operation

This is a fully integrated e-mobility solution that combines generation, storage, and ultra-fast charging.

It represents the first of fifteen similar hubs to be developed across Greece by 2025, laying the foundation for a nationwide network of advanced green charging stations.